| UNALAKLEET SANITATION ROAD | |||||||||||||||||||||||||||||||||||||||
| Unalakleet Sanitation Road ADOT&PF Project No. 61185 | |||||||||||||||||||||||||||||||||||||||
| Printable version of Unalakleet Sanitation Road scoping letter | |||||||||||||||||||||||||||||||||||||||
The Alaska Department of Transportation and Public Facilities (ADOT&PF), in cooperation with the Alaska Division of the Federal Highway Administration (FHWA), is proposing to construct a new road segment leading to the existing Unalakleet landfill and raise the grade of the existing landfill road to reduce flooding impacts. Unalakleet is located on the Norton Sound at the mouth of the Unalakleet River, 148 miles southeast of Nome and 395 miles northwest of Anchorage. The proposed road is in Section 23, Township 18 South, Range 11 West, Kateel River Meridian, and the proposed re-grading is in Sections 34 and 35 of Township 18 South, Range 11 West, Kateel River Meridian (refer to Figure 1). Unalakleet is located at latitude 63.891667 North and longitude 160.809444 West (USGS Quadrangle Unalakleet D - 4). |
|||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||
| Purpose
and Need The City of Unalakleet has proposed to construct solid waste drying beds to alleviate the severely overloaded, existing sanitary sewage lagoon and has requested the ADOT&PF construct an access road. The ADOT&PF is also proposing to raise the grade of the landfill road on the east side of Kouwegok Slough, as water has washed over the roadway and eroded the existing embankment near the bridge (refer to Figure 1 for the location of the proposed projects). The following issues will be addressed in this project: |
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
Preliminary Research
Results |
|||||||||||||||||||||||||||||||||||||||
If you have any questions regarding this project, please call our Environmental Consultant, Kristen Hansen, at DOWL Engineers, at 562-2000, or by e-mail to khansen@dowl.com. Should you have any questions on the design of the proposed project, pleaes contact Cindie Little, P.E., Engineering Manager, at (907) 451-2284 or e-mail cindie_little@dot.state.ak.us. |
|||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||