The
Municipality of Anchorage (MOA) is proposing intersection improvements at Tudor
Road and Lake Otis Parkway. Project Management & Engineering Department
and their consultant, DOWL Engineers, are evaluating options to provide congestion
relief at the intersection. |
|
|
|
|
|
|
|
| Existing
Conditions |
| |
Tudor
Road is a high volume principal arterial roadway that is part of the National
Highway System. At about 50,000 vehicles per day, the Tudor Road corridor
between Bragaw Street and Lake Otis Parkway carried the highest 2004 Annual
Average Daily Traffic (AADT) volume of any road in the Anchorage Bowl.
Lake Otis Parkway is a major arterial intersection that carries about
30,000 vehicles per day through the project corridor. The intersection
of Tudor Road and Lake Otis Parkway is a bottleneck for traffic moving
from northeast to south Anchorage and is likely the most over-capacity
major intersection in Anchorage. The road is heavily used by commuter
traffic in addition to adjacent residential and commercial access. The
U-Med District, located immediately north of the study corridor, is one
of Anchorage's primary employment centers. Significant development in
the U-Med District is in progress and substantial undeveloped area is
available for expansion. This development will result in even greater
congestion in the Tudor Road and Lake Otis Parkway corridors. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
|
|
|
|
|
|
|
| Purpose
and Need |
| |
Due
to the magnitude of the congestion at the Tudor Road/Lake Otis Parkway
intersection, several projects have been initiated to cumulatively reduce
delays. These projects include the Abbott Loop Extension (currently under
construction), Dowling Road Extension (currently in design), and the Piper
Street Improvements (completed in summer 2005). In conjunction with these
other congestion relief projects, the purpose of this project is to increase
turning movement capacity in order to reduce overall delay at this intersection.
Secondary benefits of the project will include reduced emissions and improved
air quality, improved pedestrian accommodations, and a potential reduction
in the number of crashes at this intersection. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
|
 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |